Updated: Rahn Bridge Closed for Renovation
| Rahn Bridge over Campus Drive and between Parking 2 and the Rahn Building closed Nov. 9 to allow for its renovation. Construction will take about four to six months. The closing was originally scheduled for Nov. 4.
To access the Rahn Building from Parking Lot #1, 1A, 1B and Parking 2, you will need to enter the Central Building on ground level. You will be able to go through health screening at that entrance and then follow detour signs to the Rahn Building.
During the renovation, there will be closed signs, cautions signs, and will have traffic flaggers. if you have any questions or concerns, please contact Keith Johnson @ 501.251.5781